GRAE-P400-Grae Impregnation

GRAE Impregnation mortar-Q

GRAE Impregnation mortar

Super fast diameter powder type
[For bonding insulation and impregnating mesh]

Product Overview

– Powder mortar used for attaching various insulation materials or impregnating mesh 
– Products with excellent adhesion, water resistance, and durability
– A product capable of follow-up work around 4 hours after construction with ultra-fast-hardening powder (Impregnated-Q)

Product Features

Various insulation materials can be attached and mesh can be impregnated It is possible to reduce construction period and construction cost with ultra-fast light type product

Physical properties

categoryContentRemark
Main componentPorous ceramic,
highly elastic acrylic emulsion
TypeHydrophilic
Solid content70~75%
specific gravity0.7
PH6.8~7.0
Theoretical Coating
Thickness
1.3m²/L
shapeOne component
Volume solids70+/-3%
Dry film thickness0.4~ 0.6mm or more
Color / Paint
appearance
White / matte, semi-gloss

Test result

Test ItemsunitSample classificationResultTest Methods
Ductility change%-9KS F 4716 : 2016
Adhesion strength (standard curing)MPa-1.3KS F 4716 : 2016
Adhesion strength
(low temperature curing)
MPa-1KS F 4716 : 2016
Resistance to microcracks--clearKS F 4716 : 2016
Impact resistance--clearKS F 4716 : 2016
Water absorption coefficient (W)kg/m2h0.5-0.1KS F 4716 : 2016
Resistance to repeated warm/cool action
(appearance)
--clearKS F 4716 : 2016
Resistance to repeated warm/cool action
(adhesive strength)
MPa-1.3KS F 4716 : 2016
Moisture permeabilitym-1.1KS F 4716 : 2016

Construction & Precautions

Construction method
– Ground cleaning: Before work, oil, dust, mold and various contaminants are cleaned and the paint part is thoroughly removed.
– Primer work: Sufficiently apply our primer to increase adhesion to the base surface and prevent dryness
– When bonding insulation
Measure 26-28% (6-7L/bag) of water compared to the powder and add the powder mortar slowly and stir thoroughly with a blender.
Insulation is attached by placing a trowel and additionally in several places, but over 40% of the adhesive surface is applied.
The thickness of the adhesive mortar can be changed according to the site conditions, and the surface is flat by pressing the insulation material.
– During mesh impregnation
Measure 26-28% (6-7L/bag) of water compared to the powder and add the powder mortar slowly and stir thoroughly with a blender.
– At the time of mesh impregnation (Grae impregnation -Q)
Measure water 32-34% (21-22L/25kg powder mortar + 40kg cement) compared to the powder and put it in After stirring 40kg of cement, slowly add powder mortar and stir it sufficiently with an electric blender.
At this time, if further reduction of construction is required, up to 2 powder mortar can be mixed with 1 cement bag.

Construction site

Blend

Blend

Application

Precautions

– Keep the powder mortar from getting wet by rain, and the insulation material must be in a dry state when it is installed on the insulation material. – After the impregnated powder mortar, apply a primer before the 2nd work to prevent whitening during finishing work. – Work temperature above 5℃ and below 35℃, and install after proper maintenance of direct sunlight and wind as the cause of cracks. – If you apply a primer after drying to the touch, cracks and whitening can be prevented. – The super fast hardening type (Gra impregnation-Q) has a short pot life, so the work volume is agitated within 30 minutes.

Construction site utility

Building exterior

Inside the building

Scroll to Top